Heavy

Construction 

Route 6 Buchanan County (MODOT)

Project included coldmill and resurface from I-29 to Route AC; a total length of 1.551 miles.  ADA improvements were also included from Woodbine rd to Rt. AC; a total length of 1.6 Miles

 

6200 Nieman Storm Drainage Improvements

2018 ABC Heart of America Excellence in Construction Award

This project includes installation of 3-10'x9' RCB, retaining walls, soldier pile and encasements, asphalt street and parking lot repairs, curb and gutter, and demolition of two buildings.

6200 Nieman Storm Drainage Improveme
6200 Nieman Storm Drainage Improveme
6200 Nieman Storm Drainage Improveme
6200 Nieman Storm Drainage Improveme
Route 6 Buchanan County (MODOT)
Route 6 Buchanan County (MODOT)
Route 6 Buchanan County (MODOT)
Route 6 Buchanan County (MODOT)
Route 6 Buchanan County (MODOT)

Tremont Square Parking Lot Reconstruction

The project included the reconstruction of a private parking lot, for the Tremont Square Development District, including reconfiguration, storm, lighting, and landscaping.

Tremont Square Parking Lot Reconstru
Tremont Square Parking Lot Reconstru
Tremont Square Parking Lot Reconstru
Tremont Square Parking Lot Reconstru

Route YY Buchanan County

Work under this project consisted of 6" HMA (Superpave) resurfacing, ADA improvements, concrete retaining wall, traffic signal, and storm sewer.

Route YY Buchanan County
Route YY Buchanan County
Route YY Buchanan County
Route YY Buchanan County
Route YY Buchanan County

Independence Blvd. & Benton Blvd. Intersection

Work under this project consisted of realignment and paving of the intersection, signalizing, street lighting, pedestrian lighting, bike ways, landscaping, sewer structures, curbing and roadway drainage, and historical preservation.

Independence Blvd. & Benton Blvd. In
Independence Blvd. & Benton Blvd. In
Independence Blvd. & Benton Blvd. In
Independence Blvd. & Benton Blvd. In
Independence Blvd. & Benton Blvd. In

Main Street Viaduct Over KC Terminal Railway

2015 ABC Heart of America Excellence in Construction Award

This Kansas City Missouri project – Main Street vault repairs and viaduct ramp removal – was part of the revival of downtown Kansas City, built in conjunction with the Kansas City Streetcar project and to support a new hotel within the popular Crossroads District.

Main Street Viaduct Over KC Terminal
Main Street Viaduct Over KC Terminal
Main Street Viaduct Over KC Terminal
Main Street Viaduct Over KC Terminal

Searcy Creek Parkway

2008 ABC Heart of America Excellence in Construction Award

The Searcy Creek Parkway Project is a mile and a half of new roads near the Kansas City Police Department’s Shoal Creek Patrol Division recently opened near the new Regional Training Academy at Interstate 435 and Pleasant Valley Road. The route is now wider, safer, and more scenic.

Searcy Creek Parkway
Searcy Creek Parkway
Searcy Creek Parkway
Searcy Creek Parkway

Barry Road & I-29 Ramp Improvements, Kansas City, MO

2005 ABC Heart of America Chapter Excellence in Construction Award

The Searcy Creek Parkway Project is a mile and a half of new roads near the Kansas City Police Department’s Shoal Creek Patrol Division recently opened near the new Regional Training Academy at Interstate 435 and Pleasant Valley Road. The route is now wider, safer, and more scenic.

Barry Road & I-29 Ramp Improvements,
Barry Road & I-29 Ramp Improvements,
Barry Road & I-29 Ramp Improvements,
 

MegaKC

  • Instagram

1491 Iron St, North Kansas City, MO 64116, USA

(816) 472-8722

©2020 by MegaKC.

Tremont Square Parking Lot Reconstru